Moving: Day 5 and 6
Posted on Jun 06, 2010 by Anne Lopez in News
Moving Day 5:
Wall construction, wall sanding, bamboo flooring starter strip gluing and curve cutting.
Moving Day 6:
Final coat of mud on the light table, carpet is installed, conference and Peter’s office flooring is done.
Moving: Day 3 and 4
Posted on May 27, 2010 by Peter Ellis in News
Moving Day 3:
Wall construction began, touch-up paint, paint trim pain.
Moving Day 4:
Wall construction, wall sanding, more painting, ceiling repair, bamboo flooring got delivered.
Moving: Day 1 and 2
Posted on May 24, 2010 by Anne Lopez in News
Moving Day 1:
Carpet removal, floor clean-up, wall patching, general clean-up.
Moving Day 2:
Taping to paint, prepping the walls, some light construction, painting.


