anne Moving: Day 5 and 6

Posted on Jun 06, 2010 by Anne Lopez in News

Moving Day 5:

     

Wall construction, wall sanding, bamboo flooring starter strip gluing and curve cutting.

Moving Day 6:

 

Final coat of mud on the light table, carpet is installed, conference and Peter’s office flooring is done.

peterellis Moving: Day 3 and 4

Posted on May 27, 2010 by Peter Ellis in News

Moving Day 3:

Wall construction began, touch-up paint, paint trim pain.

Moving Day 4:

     

Wall construction, wall sanding, more painting, ceiling repair, bamboo flooring got delivered.

anne Moving: Day 1 and 2

Posted on May 24, 2010 by Anne Lopez in News

Moving Day 1:

     

Carpet removal, floor clean-up, wall patching, general clean-up.

Moving Day 2:

   

Taping to paint, prepping the walls, some light construction, painting.